Hongfa · 鸿发
EN
中文EnglishРусскийFrançaisالعربية日本語한국어繁體中文Tiếng Việt

HONGFA / Quality & project evidence

Quality & project evidence

Quality requirements become useful when they can be traced to a part, a drawing and an acceptance record. Use the project checklist to define the evidence needed before comparing components.

Screw component and measurement-tool illustration — Illustration
01

Start with part and drawing identity

Record the part identifier, drawing number, revision and units. Identify critical mating features and measurement positions. A collection of numbers without their locations cannot support a reliable part-to-part comparison.

02

Connect the method to the requirement

For dimensional, hardness, metallurgical or non-destructive checks, identify the agreed method, inspected feature and acceptance criterion. Not every check is relevant to every component; define the scope for the actual part.

03

Keep reports linked to the project

A report should identify the item or material, the issuing party, date and scope. Equipment lists, certifications and delivery capabilities are only published when Hongfa’s supporting documents are available.

Review before specifying
Review pointRecord for the projectWhy it matters
GeometryPart drawing, revision, units and mating featuresA component code does not define every interface.
Material & constructionBody grade, working surface or liner, treatment routeBody and working surface need separate descriptions.
Operating contextPolymer, formulation, filler and observed changesA material comparison needs the application context.
AcceptanceMeasurement positions, method and agreed criteriaThe same basis is needed when comparing parts.

Project downloads

A better brief.
A clearer next step.

Organize the machine, material, drawings and open questions before a technical discussion.